Jump to content



Featured Articles

Check out the latest featured articles.

File Library

Check out the latest downloads available in the File Library.

New Article

Product Viscosity vs. Shear

Featured File

Vertical Tank Selection

New Blog Entry

Low Flow in Pipes- posted in Ankur's blog

Feed & Epic


This topic has been archived. This means that you cannot reply to this topic.
1 reply to this topic
Share this topic:
| More

#1 Noora

Noora

    Junior Member

  • Members
  • 10 posts

Posted 27 August 2003 - 12:08 AM

Hi:)
I'm quite confused between the differences between FEED (front end engineering design) stage and EPIC (engineering, procurement,installation and commissioning) stage of the project life-cycle..
Can anyone please help? rolleyes.gif

Thank you very much

#2 edfarman

edfarman

    Brand New Member

  • Members
  • 8 posts

Posted 29 August 2003 - 01:06 AM

wink.gif Hi smile.gif...

May be I can explain in simple way.

FEED : Activity of engineering consultant prior to EPIC stage to create a basis engineering data that will be used as ITB for project execution tender.

EPIC : Activities of project execution by selected EPIC contractor in detail engineering work, purchasing, installation and commisioning as aggreed in contract document (Based on ITB requirement).

sad.gif Some times I found that FEED can be a part of proposal work in EPIC tender, some of EPIC Contractors have a capability of Engineering Consultant. Owner just provide preliminary (raw) technical data based on their Feasibility study and OE. Owner like to minimize cost for FEED stage.

Please CMIIW...
biggrin.gif