How do you have -15 C water phase inside 3 Phase Condensate Flash Tank instead of ice?
Posted 09 July 2015 - 08:05 AM
Edited by Dmitry, 09 July 2015 - 08:11 AM.
Posted 09 July 2015 - 08:43 AM
How do you cool the inlet wet gas from 0 C to -20 C without a heat exchanger?
Posted 09 July 2015 - 08:54 AM
How do you cool the inlet wet gas from 0 C to -20 C without a heat exchanger?
Dear, I just shown Low temperature separator so you can see from where we have rich glycol feed into regeneration train. I did not show upstream gas/propane chiller, gas/gas heat exchanger since it's not have related to the current issue.
Posted 09 July 2015 - 10:50 AM
Why do you not recover -15 C cooling duty to your inlet gas? If you don't show us the whole picture, how do you expect the best solution from us? You may need to conduct a whole site pinch analysis to obtain the optimized heat transfer scheme. The pinch analysis will involve much more data than what you have posted here.
Posted 10 July 2015 - 12:54 AM
Why do you not recover -15 C cooling duty to your inlet gas? If you don't show us the whole picture, how do you expect the best solution from us? You may need to conduct a whole site pinch analysis to obtain the optimized heat transfer scheme. The pinch analysis will involve much more data than what you have posted here.
Sorry but what do you mean about recover - 15 C cooling duty to inlet gas?
Posted 14 July 2015 - 01:36 PM
Dmitry,
This looks reasonable to me.
Posted 14 July 2015 - 11:29 PM
Dmitry,
This looks reasonable to me.
This is what I expected, however how can I check it?
May be I can model it in Hysys.
I have inlet flow of water + condensate to the vessel, 10 m3/day with temperature let's say -15 deg. C. So I need to add heat to the the vessel to heat it to +25...+40 deg. C.
Using Hysys I can find heat flow required for this.
After I can use this heat flow to see what will be the outlet temperature og glycol, with max flow rate 20 m3/day and temperature 110 deg. C.
May be me it's too much hot glycol will be and I need to install valves to use part of glycol.
My thoughts is correct?
Dmitry
Edited by Dmitry, 14 July 2015 - 11:31 PM.
Posted 17 July 2015 - 09:34 AM
Dmitry, we do this all the time, although in a slightly different manner, on dewpoint control units. Your PFD does not appear to show everything, but I can say that using the lean MEG from the Regenerator to heat the Glycol/water phase in the Low Temperature Separator is commonly done, although it is supplied from the discharge of the MEG circulation pumps. Using the stream from the suction of the MEG pumps will not work very well, if at all, as you have essentially no pressure available to circulate the hot MEG through the coil as the MEG Regenerator operates at essentially atmospheric pressure. I have attached a quick sketch of how we usually do it. Sizing the coil itself is kind of a black art, depends on the LTS temperature and size of the vessel/boot, and flow rate. I typically use a U value of 5-20 Btu/hr/ft2-F (sorry, you'll have to convert to SI units yourself). The coil is typically 3/4" or 1" BWG 14 tube shaped by coiling it around a pipe. ie. if the vessel/boot is 24" (610mm) dia we'd probably use a 14-16" (350-400mm) NPS pipe to couil the tube around - bear in mind the coil will "spring back" and end up a couple inches larger diameter than what you coiled it around. For large vessels you can use a flat multipass coil.
HTH
Cheers
Edited by ColinR33, 17 July 2015 - 09:36 AM.
Posted 17 July 2015 - 09:34 AM
Since it is glycol, I would use ProMax to get a good estimate of the heat flow. ProMax would be particularly helpful in knowing the BTEX absorbed into the MEG. BTEX can be soluble in glycol. I've only ever seen ProMax model that well.
That said, this will all depend on the how heavy your wet gas is and the performance of your inlet separator. If it has a lot of heavy components, you may not have enough glycol to provide the heat you desire. I think this should work in theory. You can model it and see if you have enough glycol for the process. You can always regulate the pressure of the flash tank based of the amount of glycol you have for your heating medium.
Posted 11 August 2015 - 02:59 AM
Dmitry, we do this all the time, although in a slightly different manner, on dewpoint control units. Your PFD does not appear to show everything, but I can say that using the lean MEG from the Regenerator to heat the Glycol/water phase in the Low Temperature Separator is commonly done, although it is supplied from the discharge of the MEG circulation pumps. Using the stream from the suction of the MEG pumps will not work very well, if at all, as you have essentially no pressure available to circulate the hot MEG through the coil as the MEG Regenerator operates at essentially atmospheric pressure. I have attached a quick sketch of how we usually do it. Sizing the coil itself is kind of a black art, depends on the LTS temperature and size of the vessel/boot, and flow rate. I typically use a U value of 5-20 Btu/hr/ft2-F (sorry, you'll have to convert to SI units yourself). The coil is typically 3/4" or 1" BWG 14 tube shaped by coiling it around a pipe. ie. if the vessel/boot is 24" (610mm) dia we'd probably use a 14-16" (350-400mm) NPS pipe to couil the tube around - bear in mind the coil will "spring back" and end up a couple inches larger diameter than what you coiled it around. For large vessels you can use a flat multipass coil.
HTH
Cheers
Thanks,
We already use heat from glycol to heat Glycol/water phase in the LTS on Dew point unit as you shown on your PFD, this is the standart solution for these units.
My question if we can use heat from this glycol to heat water in the 3-phase second stage condensate flash drum?
I added this info on your PFD, so you can see what is my idea.
If we will take all heat in the condensate flash drum, glycol may go to the Dew point unit already cold, and it will not preheat water Glycol/water phase in the LTS on Dew point unit...
Dmitry
Edited by Dmitry, 11 August 2015 - 03:08 AM.
Posted 11 August 2015 - 12:06 PM
In theory, yes it could be done, but as you note, there are some potential problems with overcooling the glycol. Another option is to add a small pump to pump hot EG directly from the regenerator surge section to the C5+ flash drum coil and then back into the reboiler section of the regen. This works if you have extra heat duty available in the regen (we've done similar things in the past). We've used a little Grundfos or Deanline pump for this service.
Posted 12 August 2015 - 12:15 AM
In theory, yes it could be done, but as you note, there are some potential problems with overcooling the glycol. Another option is to add a small pump to pump hot EG directly from the regenerator surge section to the C5+ flash drum coil and then back into the reboiler section of the regen. This works if you have extra heat duty available in the regen (we've done similar things in the past). We've used a little Grundfos or Deanline pump for this service.
Hello Colin,
Thanks for the informaion, so how you done this? How you operated this pumps? Do you have manual valves or some control valves to keep required flow of hot glycol? If you have PFD or P&ID it will help.
We have about 50% availblle duty on regenerator so it's good!
Thanks again!
Edited by Dmitry, 12 August 2015 - 12:16 AM.
Posted 12 August 2015 - 09:07 AM
We just used a small pump with manual valves and let it recirculate, no need for anything fancy, just need a globe valve to get some backpressure on the pump discharge. Get it set up and let it run. The little Deanline and Grundfos pumps can happily operate as low as 1-5 USGPM. Suction block valve & strainer, discharge pressure gauge, check valve, isolation valve and manual globe valve, isolation and bypass valves on coil, then back to regen. Adjust the flow to get the temperature you want in the coil, use the PI to check where you are on the pump curve. If you really want, install a local flow meter. Thats it. Cheers.
Posted 13 August 2015 - 08:46 AM
We just used a small pump with manual valves and let it recirculate, no need for anything fancy, just need a globe valve to get some backpressure on the pump discharge. Get it set up and let it run. The little Deanline and Grundfos pumps can happily operate as low as 1-5 USGPM. Suction block valve & strainer, discharge pressure gauge, check valve, isolation valve and manual globe valve, isolation and bypass valves on coil, then back to regen. Adjust the flow to get the temperature you want in the coil, use the PI to check where you are on the pump curve. If you really want, install a local flow meter. Thats it. Cheers.
Yes, you right, the hot glycol should be routed to the coil with circulation pump. It will not work if I just take glycol from regenerator outlet and sent it to coill. However a per your option we require to install little Deanline and Grundfos pumps.
What about if we will take glycol downstream of existing glycol pump. I am worry that pressure on discharge is 50 bar, and coli in the new vessel design for the 18 bar. So this option is bad...
Posted 14 August 2015 - 05:04 PM
Either way you have to make sure you have relief capacity available in case of coil rupture (like tube rupture case in a heat exchanger, whether the coil has the higher pressure (flow into vessel through rupture) or the vessel (flow from vessel into coil through rupture). Also, taking from downstream of the inection pumps you have to be careful you don't over cool teh glycol as was discussed earlier.
Posted 17 August 2015 - 12:44 AM
Either way you have to make sure you have relief capacity available in case of coil rupture (like tube rupture case in a heat exchanger, whether the coil has the higher pressure (flow into vessel through rupture) or the vessel (flow from vessel into coil through rupture). Also, taking from downstream of the inection pumps you have to be careful you don't over cool teh glycol as was discussed earlier.
The internal coil designed with 150# piping the same as vessel, what we need to preheat. Pressure on injections pumps could be 40-60 bar (piping 600#), since this is gas plant pressure. Now I see that taking hot glycol from injection pumps discharge will not work due to this reason and due to requirements to have hot glycol on LTS as you mensioned.
I will look closer for the option with installation of new small circulation pump as you propose, taking glycol from regenerator
Do you have info what is the model of you similar pump? Could you share P&ID with your glycol system and this pump?
Many thanks!
Dmitry
Posted 21 August 2015 - 01:19 PM
Like I said, a Dean 3/4DL or a little Grundfos will do the trick and very simple system as I laid out in post #15.
Posted 14 September 2015 - 11:15 PM
Like I said, a Dean 3/4DL or a little Grundfos will do the trick and very simple system as I laid out in post #15.
Thanks!
Steam Pressure In Heat ExchangerStarted by Guest_mvanrijnbach_* , 15 Apr 2025 |
|
![]() |
||
Heat Exchanger Steam FlowStarted by Guest_aliebrahem17_* , 25 Nov 2024 |
|
![]() |
||
Discussion - Predict Storage Tank Heat Transfer Precisely By Jimmy D KStarted by Guest_raj shekhar_* , 25 Mar 2025 |
|
![]() |
||
Cross Over Temperature In Countercurrent Heat ExchangerStarted by Guest_panoska_* , 18 Feb 2025 |
|
![]() |
||
Aspen Hysys - Blowdown Utility Heat Flux MethodStarted by Guest_yuvi.ardekar1999@gmail.com_* , 27 Feb 2025 |
|
![]() |