Jump to content



Featured Articles

Check out the latest featured articles.

File Library

Check out the latest downloads available in the File Library.

New Article

Product Viscosity vs. Shear

Featured File

Vertical Tank Selection

New Blog Entry

Low Flow in Pipes- posted in Ankur's blog

Astm D7169 To Tbp


This topic has been archived. This means that you cannot reply to this topic.
4 replies to this topic
Share this topic:
| More

#1 vanecnr

vanecnr

    Junior Member

  • Members
  • 11 posts

Posted 09 September 2015 - 07:28 AM

Good Morning

 

Is there a way to transform astm d7169 data to TBP to do a simulation in PRO/II

 

Thanks

 

Vanessa



#2 PingPong

PingPong

    Gold Member

  • Members
  • 1,466 posts

Posted 09 September 2015 - 09:08 AM

No.

 

ASTM D7169 is very close to TBP. It is a simulated distillation using GC and similar to ASTM D2887, which is also very close to real TBP.

 

You can either assume that it is the same as D2887 and enter it as wt% D2887 in PRO/II, or you can assume that it is same as TBP and enter it as wt% TBP. Choice depends on what the purpose of your simulation is: simulating an existing unit, or designing a new unit.


Edited by PingPong, 09 September 2015 - 12:30 PM.


#3 vanecnr

vanecnr

    Junior Member

  • Members
  • 11 posts

Posted 09 September 2015 - 07:39 PM

thanks 

 

No.

 

ASTM D7169 is very close to TBP. It is a simulated distillation using GC and similar to ASTM D2887, which is also very close to real TBP.

 

You can either assume that it is the same as D2887 and enter it as wt% D2887 in PRO/II, or you can assume that it is same as TBP and enter it as wt% TBP. Choice depends on what the purpose of your simulation is: simulating an existing unit, or designing a new unit.



#4 gegio1960

gegio1960

    Gold Member

  • Members
  • 518 posts

Posted 09 September 2015 - 11:52 PM

Hi PingPong.

I agree about your suggested input as TBP, but I don't understand the meaning of "Choice depends on what the purpose of your simulation is: simulating an existing unit, or designing a new unit.".

Could you kindly clarify?

Thank you and kind regards.



#5 PingPong

PingPong

    Gold Member

  • Members
  • 1,466 posts

Posted 10 September 2015 - 01:56 AM

I merely meant:

 

Simulating an existing unit: use what best fits actual operating data.

 

Simulating a new design: use what gives most conservative design.