Dear All,
- A vessel is operating at low pressure 0,1 barg with liquid storage purpose with H2S content.
- Level bridle vent line is connected to LP Flare with a check valve on vapor line.
- Vessel vapor line is connected to closed system through pressure control valve. Split range controller is maintaining vessel pressure.
- Due to presence of check valve, Client has requested to delete vent line to LP flare and put N2 hose to drain out level bridle content during its flushing stage.
My query is as follows:
Can we connect level bridle vent line to vessel vapor outlet line before its outlet pressure control valve so that N2 hose connection is avoided ?
Thanks.
Regards.