Jump to content



Featured Articles

Check out the latest featured articles.

File Library

Check out the latest downloads available in the File Library.

New Article

Product Viscosity vs. Shear

Featured File

Vertical Tank Selection

New Blog Entry

Low Flow in Pipes- posted in Ankur's blog

0

Aspen Process Economic Analyzer On Air Cooler In Hysys

air cooler hysys aspen economic process design equipment cost costing

No replies to this topic
Share this topic:
| More

#1 andreasdiga

andreasdiga

    Brand New Member

  • Members
  • 1 posts

Posted 20 November 2018 - 02:23 AM

Hi

 

I am trying to simulate Binary cycle on hysys for my thesis, however, this error keep happening:

 

In this file, as you can see, the air cooler works properly (no temperature cross). But when I turn the economic (APEA) on, it doesn't show the air cooler equipment cost because temperature cross. How did this happen and how can I fix it? thank you.

 

Attached File  1.PNG   157.01KB   2 downloadsAttached File  2.PNG   198.85KB   2 downloads

 

 






Similar Topics